America’s Working WaterwaysPost X: The McClellan-Kerr Arkansas River Navigation System

1 hour ago
9 min read

Most grain people know the Mississippi River. Far fewer have worked the McClellan-Kerr Arkansas River Navigation System.


I never loaded a barge on the McClellan-Kerr. My river years were spent on the Illinois, the Upper Mississippi at St. Louis, the lower Ohio at Mound City, down in Louisiana, and out on the Columbia. But anybody who has built a loading plan around draft, lock time, and a string of empties understands the questions this system asks every day.


Most Americans don't think of Oklahoma when they think of barges. Yet every week, barges load at the Tulsa Port of Catoosa, about 445 miles from the Mississippi River and roughly 420 feet higher. That is the work of the McClellan-Kerr Arkansas River Navigation System, better known as MKARNS, the only year-round waterway reaching deep into the southern Great Plains.


For grain shippers in Oklahoma, Kansas, and western Arkansas, it is the only barge option that does not begin with a long truck or rail haul to the Mississippi or the Gulf. When it works, it keeps rail rates honest. When it doesn't, elevators lose an option and the basis feels it.


How Oklahoma Reaches the Mississippi

Start at the top and walk downstream. The system is one continuous channel, but three stretches explain how it fits together.

•   Verdigris River and the Port of Catoosa. The head of navigation. Fertilizer comes in, wheat and soybeans go out, and a large industrial park surrounds the docks. Rail already runs through the port; a unit-train facility is under construction.

•   The Arkansas River proper. From the Verdigris confluence down through Muskogee, Fort Smith, Little Rock, and Pine Bluff. This is the longest stretch and the one most subject to shoaling after high water.

•   Arkansas Post Canal and the White River. This is the part most readers don’t know. The barge never comes out the mouth of the Arkansas. Coming off the Mississippi at about river mile 599, a tow runs up the White River, through Montgomery Point Lock and Dam, then through the man-made Arkansas Post Canal to reach the Arkansas. This is the front door. A good channel upstream does little good if a tow cannot get through the entrance.


A River That Had To Be Built

The natural Arkansas River was no barge river. It had shifting sandbars, wide swings between low summer flow and spring floods, and a long record of flooding. A shipper could not plan around it.


Congress authorized the system in the Rivers and Harbors Act of 1946. Construction ran through the 1950s and 1960s. In January 1971 Congress named it for Senator John L. McClellan of Arkansas and Senator Robert S. Kerr of Oklahoma. Kerr had died in 1963 and never saw it finished. President Nixon dedicated the system at Catoosa on June 5, 1971.


The engineering answer was a chain of locks and dams creating a series of navigation pools, backed by upstream reservoirs in Oklahoma that hold floodwater in the spring and release it when the river drops. Montgomery Point Lock and Dam, added in 2004 near the mouth of the White River, holds a navigation pool when the Mississippi runs low. There are 18 locks in all. The chambers are 110 by 600 feet—large enough for an eight-barge tow of jumbo barges to pass in a single lockage most of the time.



That made scheduled commercial navigation possible. It did not end floods, sediment, or low water. Those challenges still remain when running freight on MKARNS. The maintained channel is 9 feet deep. Congress has authorized 12 feet. More on why that matters below.


What Actually Moves

By tonnage, rock and fertilizer carry this river. In 2024 the system handled 12.446 million tons. In 2025 tonnage fell 19.5 percent to 10.011 million tons. The drop came mainly from sand, gravel, and rock, along with lock and dam repairs and low water on the Mississippi, not from a collapse in grain.

Commodity (2025)

Tons

Change from 2024

Sand, gravel, and rock

3.626 million

down 21%

Chemical fertilizer

1.702 million

down 30%

Iron and steel

1.023 million

up 4%

Wheat

0.730 million

down 18%

Source: U.S. Army Corps of Engineers and Talk Business & Politics. Top commodities shown; total system tonnage was 10.011 million tons.


The decline was significant, but the commodity mix shows MKARNS remains a diversified industrial waterway rather than a single-commodity grain route.


Fertilizer is the most important agricultural cargo on the system. It moves both ways. The CF Industries plant on the Verdigris loads barges for downriver movement as well as receiving inbound product. Wheat and soybeans move mostly outbound—Oklahoma hard red winter wheat is the anchor grain, with soybeans close behind in most years.


That mix is what keeps the system working for elevators: barges that come up with fertilizer (or are loaded with it on the system) can go back down with grain. The match is not automatic. Timing, barge type, and positioning still matter. But freight moving in both directions helps hold the service together.


Rice gets one line. Arkansas leads the nation in rice, but its rice country is in the eastern Delta. That rice moves mostly through Mississippi River terminals and in containers, not up the Arkansas. It is not a major commodity on MKARNS.


Following a Bushel of Oklahoma Wheat

Here is how a representative load gets from an Oklahoma field to a ship:

•  Harvested hard red winter wheat arrives at a country elevator, is graded and stored, then trucked to a river terminal at Catoosa or Muskogee.

•  At the 9-foot draft, a barge takes about 1,500 to 1,600 tons.

•  Tows are built around eight barges so they fit the locks. The tow steps down the staircase of pools—18 lockages.

•  It leaves the Arkansas through the Arkansas Post Canal, finishes on the White River, and locks through Montgomery Point onto the Mississippi.

•  Barges are dropped at a fleet and rebuilt into a larger open-river tow for the run to the Gulf export elevator.

•  Fertilizer runs much of the same route in reverse, or is loaded on the system and moves downriver. That is the load that keeps barges from coming back empty.


Under normal operating conditions, operators generally treat 5 to 7 days as a working rule of thumb for an eight-barge tow from Catoosa to the Mississippi. That figure has not been independently validated or published as an official schedule; it is simply the range commonly used in the trade when the river is open and locks are functioning normally. Double lockages add hours. Because the system has 18 locks, a large share of the total transit time is spent in lockages rather than under way.


When the River Doesn’t Work

Every waterway has weak points. On MKARNS, a long chain of single-chamber locks and a narrow connection to the Mississippi make them easy to see.


The 2019 flood closed the system for months, and tonnage fell to roughly 8.48 million tons that year. The locks survived. The problem was sediment and the time it took to restore the channel. Smaller floods and shoaling events still force temporary restrictions and draft reductions. The Arkansas carries a heavy sediment load. Shoaling in a few spots sets the loading draft for everyone.


Even when MKARNS is open, trouble downstream still hits Oklahoma shippers. Low water on the Mississippi means lighter loads, tighter barge supply, and higher freight. The 2025 season showed that a river can be open and still not work well for the customer.


An elevator has to absorb those interruptions on land. Grain keeps coming in. Storage fills. Sales commitments don’t move. A delay on the river turns into a receiving, inventory, or cash-flow problem back at the house. That is why dependable navigation matters as much as capacity on paper.


The Entrance and the Channel

Two projects tell most of the current MKARNS story: Three Rivers and the deeper channel.

Near the lower end of the system, only a narrow neck of land separates the Arkansas and White rivers. When one river runs high and the other low, water pours across that neck and cuts at it. Since the early 1970s, that erosion made it more and more likely the two rivers would carve a new channel between them. A cutoff like that could shut down navigation for months while it was closed.


The Three Rivers Project—a hardened weir at the old cutoff plus a new containment structure across the neck—was built to stop it. The Corps finished the work in 2026 at a reported cost of about $346.8 million, ahead of schedule and under budget, and held the ribbon cutting at Tichnor on August 12. Part of that money came from funds that had been intended for the 12-foot deepening. The deepening remains authorized, but it is no longer next in line.



For operators, those are two different benefits. A secure entrance protects access. A deeper channel lets you load more when conditions allow. Three Rivers delivered the first. The second is still waiting. More than 85 percent of the channel already has depths near 12 feet in normal conditions. The remaining shallow reaches control what a through tow can carry, and they are the ones that force light loading or delays when the river drops. For the elevator, a draft restriction means fewer tons per barge and a higher freight cost per bushel—even while the river stays open.


Ports, Terminals, and the Rail Connection

Major grain and fertilizer terminals sit at Catoosa, Muskogee, Fort Smith, Little Rock, and Pine Bluff. Most elevators on the system load directly to barge or transfer from rail.


The unit-train facility at Catoosa is the biggest addition coming. Phase 1 (arrival, departure, and runaround tracks) is targeted for completion by the end of 2026. The full connection, including a new bridge and the remaining trackwork, is estimated for late 2027. Planned hopper and conveyor improvements will support faster direct transfers from unit trains to barges or warehouses. The port is designing for the 24- to 36-hour turnaround the railroads expect.


The value is not just accepting a longer train. It is handling that train without tying up the manifest service already there, and moving the product through the terminal efficiently. Rail and barge get called competitors. At a transfer terminal, they have to work together.


Barge, Rail, or Truck?

There is no magic radius, but for wheat and soybeans originating within a workable truck distance of the system, barge is usually the lowest-cost way to the Gulf or to Mississippi River buyers when draft is normal. The advantage shrinks with distance, because the extra truck miles eat up the water freight savings. Rail, especially unit trains once Catoosa’s facility is fully running, competes on longer hauls or when barge draft is restricted.


The real value of the waterway is the option. An elevator with a workable barge outlet has another bid to compare and another way to reach a buyer. It does not have to ship everything by water to benefit. When the river is restricted, that choice goes away and the basis weakens. Part of the river’s value shows up on bushels that never touch a barge. When a shipper has a second option, the rate on the first one stays more competitive.


What Needs Attention

•  Finish the remaining shallow spots. The authorization exists. Funding has been diverted. The controlling reaches still set the load for everyone.

•  Keep the entrance maintained. Three Rivers took care of the cutoff threat. Maintenance decides whether it stays taken care of.

•  Invest in terminals for faster turnaround. More channel does not help much if loading, unloading, or rail switching becomes the bottleneck.

•  Publish draft and restriction information in real time. Operators piece it together now from Corps notices and word of mouth. Loading decisions are a lot easier to get right before the barge leaves the dock than after it hits a problem downstream.


Where It Stands

Item

Status

Route

Catoosa, Okla., to Mississippi River via White River

Length / Locks

445 miles; 18 locks (110 × 600 ft); typical tow ~8 barges

Draft

9 ft maintained; 12 ft authorized; majority already near 12 ft

2025 tonnage

10.011 million tons (down 19.5% from 2024)

Three Rivers

Completed 2026; ribbon-cutting August 12

Catoosa unit train

Phase 1 by end of 2026; full line estimated late 2027

GG50 Operator Take

MKARNS does not have to carry Mississippi River volumes to matter. It is the only barge system that reaches the southern Plains without a long haul to the Mississippi first, and that makes it important for wheat and soybean shippers in Oklahoma, Kansas, and western Arkansas even when volumes are modest.


With Three Rivers finished and the unit-train facility going in at Catoosa, the system is in better shape than it has been in years. What is left is a few shallow reaches, small tows, and no good real-time information when restrictions hit.


The operating test is simple: Can we get the barge, load it to a useful draft, move it on time, and make the delivered price work?


For the grain business, the value is not barge instead of rail. It is having both—and keeping both dependable enough to use.


If you have worked this river, run a terminal on it, or shipped grain or fertilizer through it, I would like to hear what I missed. Share your experience in the comments. We all learn more when people who have done the work add what they know.



Next up in the series is Post XI- Tom, Black Warrior, and Mobile: The Southern Agricultural Corridor


Best,

Grain Guy Fifty